the sheetrock's taped and painted. the doors are (finally) hung so that they open all the way .. that was dan's job and it took him until today to get it all figured out ... waiting now only for the concrete slab for the storage shed for the steel and the rest of the siding, which should be installed next week
or the week after .. getting close now ... more metal shop photos here.
they open all the way ...
they close all the way and the transom glass is in now ... time for interior trim ..
and it's high foliage fall in vermont, and the weather for the last two weeks has been superb.