Hardware on ... first coat of finish
Waiting for the hardware now
7/3/08 shows the seperate top unit and the back of the base cabinet
The assembled case
Original sketch above and CAD drawing below
First iteration / variation to the right
Final shop drawing ... all drawers
Showing the interior drawer supports
Starting the dovetails for the 17 drawers
Starting the interior frames .... we're gonna count the pieces of wood so far tomorrow ...
The fronts and backs of the case are glued up, but the ends are not yet. We left some pieces out so we can see what we're doing inside while we'e building the drawer supports...
Sanding parts of the top case prior to first rough assembly
The top 3 case 'skeletons' assembled
Showing the crotch cut boards we'll use for the side panels ... They'll be split and half used for each end of the upper cases. I've got a great board for the top panels too.
Sanding parts of the top case prior to first rough assembly
The top 3 case 'skeletons' assembled
Showing the crotch cut boards we'll use for the side panels ... They'll be split and half used for each end of the upper cases. I've got a great board for the top panels too.
First assembly with all the panels prior to final fitting and glue up ...
ALL the parts on the two carts are for inside the cabinet ...
drawer sides and drawer supports